Rocky shoreline with dark rocks in white surf below a bluff covered in green and golden coastal shrubs

Mission Viejo Construction Projects 2026: Housing, Mall and Roads

Quick answer: The biggest Mission Viejo construction projects to watch in 2026 are a possible housing development on a 22.8-acre city site east of Saddleback College, a roughly 50,000-square-foot outdoor expansion at The Shops at Mission Viejo, Caltrans' I-5 project with work at Oso Parkway, and the city's resurfacing and signal-synchronization program. Plans and timelines can change, so check the city and the agency running each project.

By Darren Shepherd, Mission Viejo real estate agent, CA DRE #02000042, The Darren Shepherd Team at Compass California, Inc.

Mission Viejo has a reputation for never changing. Same parks, same neighborhoods, same lake. That's becoming less true. New housing, a major mall expansion, freeway construction, road work and state housing requirements are all in motion at once. I've worked in Mission Viejo and South Orange County real estate for over a decade, and these are the projects I'd watch if you own here or are thinking about buying. Keep in mind that project timelines can change.

What's being built in Mission Viejo right now?

1. New homes near Saddleback College

On April 14, 2026, the City Council unanimously approved an agreement with Trumark Homes "for work related to the potential purchase and development of City property identified as Site 3 in the Housing Element," per the City of Mission Viejo. Site 3 is "a 22.8-acre undeveloped property located next to and southeast of the Mission Viejo Animal Services Center off Center Drive and east of Saddleback College."

Voice of OC reported that the agreement gives the Irvine-based developer 120 days of access to study the site, that the city's housing element says only about six acres might be developed with about 215 housing units, and that at least 20% of the units are expected to be set aside for lower-income residents. A formal purchase and development agreement is expected to go back to the City Council before anything is built.

Why it matters: the state's Regional Housing Needs Assessment asks Mission Viejo to plan for 2,217 housing units in the 2021-2029 cycle, including 1,075 lower-income units, per the City of Mission Viejo. And very little of that can go on open land. In the city's Housing Element site inventory, vacant sites account for 215 of the 2,118 potential units. That's why a project on a 22.8-acre city site is a big change. If you live near Saddleback College or Center Drive, watch the access points and traffic plans when they come out. Those details will decide how the project affects your commute and, potentially, your home's value.

2. The Shops at Mission Viejo expansion

Simon, the owner of The Shops at Mission Viejo, is adding about 50,000 square feet of retail and dining space, according to the Orange County Business Journal. The plan is an "outdoor village" with outdoor dining terraces and new green spaces. North Italia and a two-level Arhaus were among the first names announced, and The Registry reported that Tommy Bahama Marlin Bar, Blue Bottle Coffee and Gus's BBQ have joined a lineup slated to debut through early 2027.

Why it matters: Mission Viejo doesn't have a traditional downtown. The mall is the closest thing we have to a central gathering place. If the expansion works, nearby owners get a more walkable dining and entertainment destination. That may mean more traffic in the short term, but more appeal over time.

3. Caltrans construction on the I-5 and Oso Parkway

Caltrans' I-5 Multi-Asset Project runs along the I-5 through San Juan Capistrano, Mission Viejo, Laguna Hills, Lake Forest and Irvine. Per Caltrans, it's a $35.1 million project to extend pavement life, restore drainage, upgrade lighting and replace overhead sign panels, with construction from January 2026 to January 2028. Work at the I-5 on-ramps at Oso Parkway is expected to be complete in April 2027.

The City of Mission Viejo reported that Caltrans started by temporarily removing a travel lane in each direction on Oso Parkway. When the work is done, Oso Parkway between Cabot Road and the I-5 northbound off-ramp will have three vehicle lanes and a bike lane in each direction. Construction may be frustrating now, but Caltrans says the project will improve traffic flow. If you're buying near Oso, drive the route at your actual commute time. A neighborhood can feel very different at 7:30 in the morning than it does during an open house.

4. The city's road and signal program

This one isn't exciting, but it may affect your week more than anything else on this list. The City of Mission Viejo resurfaces residential streets on a 7-year cycle, and this year's program covers 103 residential streets and the Aliso Creek Bike Trail in two phases. Check the city's Residential Resurfacing List to see when your street is scheduled.

The city is also working with OCTA on Measure M2-funded traffic signal synchronization. Per the city, improved timing plans are being put in on Santa Margarita Parkway, Trabuco Road, Marguerite Parkway, Olympiad/Felipe and Crown Valley, with La Paz Road and Cabot Road coming next. And this summer the city installed its first pedestrian hybrid beacon, a signalized crosswalk on Olympiad Road at the Lake Mission Viejo entrance that stops traffic only when someone presses the button to cross. None of this is glamorous, but well-kept roads, signals and crosswalks are part of why Mission Viejo has held its reputation for so long.

What housing could come to Mission Viejo next?

5. The projects we can't see yet

Mission Viejo's Housing Element lays out how the city plans to meet its housing target: projects already approved, accessory dwelling units (ADUs), development of vacant sites, and redevelopment of existing uses on sites zoned for residential or mixed-use development through an overlay. Under the city's Residential Overlay, some nonresidential properties can be developed as commercial, residential or mixed use.

ADUs are part of it too. Per the California Department of Housing and Community Development, Civil Code sections 714.3 and 4751 make HOA rules that effectively prohibit or unreasonably restrict an ADU or junior ADU on a lot zoned for single-unit residential use void and unenforceable, though an HOA can still set limited, reasonable design standards. I can't tell you exactly where the next project will show up. But "Mission Viejo never changes" will probably be less true over the next decade than it was over the last one. That's not automatically good or bad. It's something owners and buyers should watch.

What could these projects mean for your Mission Viejo home?

Retail, dining and recreation projects can improve how buyers see nearby neighborhoods. Construction traffic and new housing can create short-term challenges. The long-term effect will depend on the finished project, the traffic flow and how buyers respond. Freeway and road construction can also affect when a home shows its best.

When should you sell a Mission Viejo home near construction?

Timing matters. If you're planning to sell in the next few years, the question may not be whether to sell. The better question is when your home will show best compared with the construction near it. The answer is different for every neighborhood, and sometimes every street. Project plans, timelines and construction conditions may change, so check current updates from the city and the agency running each project.

How could these projects affect your Mission Viejo home?

Book a time to meet with me. I'll review the activity and comparable sales around your property and tell you where you stand.

Get your free home valuation, or call or text me: (949) 806-6834

More videos like this one: The Mission Viejo Life on our Vlog page. For neighborhood-by-neighborhood detail, see our Mission Viejo neighborhood pages.

Frequently Asked Questions

What new homes are planned near Saddleback College in Mission Viejo?

The city has an agreement with Trumark Homes to study Site 3, a 22.8-acre city property east of Saddleback College off Center Drive (City of Mission Viejo). The city's housing element estimates about 215 units on roughly six developable acres, with at least 20% expected to be affordable (Voice of OC). A purchase and development agreement still has to go back to the City Council.

What is being added at The Shops at Mission Viejo?

Simon is adding about 50,000 square feet of retail and dining space in an outdoor village with dining terraces and green space (Orange County Business Journal). Announced names include North Italia, Arhaus, Tommy Bahama Marlin Bar, Blue Bottle Coffee and Gus's BBQ, with the lineup slated to debut through early 2027 (The Registry).

How long will the I-5 and Oso Parkway construction last?

Caltrans lists construction on its I-5 Multi-Asset Project from January 2026 to January 2028, with the I-5 on-ramps at Oso Parkway expected to be complete in April 2027 (Caltrans). Check Caltrans for current closures.

About Darren Shepherd

Darren Shepherd leads The Darren Shepherd Team at Compass and has over a decade of experience in real estate. He is Mission Viejo's neighborhood specialist, serving all of South Orange County. Office: 33522 Niguel Road, Suite 100, Dana Point, CA 92629. Call or text (949) 806-6834.

Darren Shepherd is a California real estate salesperson, CA DRE #02000042. Responsible broker: Compass California, Inc., CA DRE #01991628.

Work with The Darren Shepherd Team

Whether you're looking for your dream home or selling your property, our team is committed to delivering exceptional results and personalized service every step of the way. Let us help you achieve your real estate goals!

Follow Us on Instagram